Click on the Image thumbnails on the left to view the documents. Use the controls on the images to navigate through the gallery. To enlarge the image click on the enlarge icon. Click on the image again to return to the gallery.
Description of 23-ZN Upgrading of the A1 bypass 1990
1. A press report stating that the upgrade costing £14.9 million is due to start in two weeks and will provide a four mile stretch of the A1 with a three lane dual carriageway with hard shoulders. It promises that lowering the road below ground level will reduce the noise in Bramham.